Here you go sent from a friends back home. http://img148.exs.cx/img148/4661/p31700716id.jpg http://img148.exs.cx/img148/6167/p31700701tj.jpg http://img148.exs.cx/img148/4572/p31700683vq.jpg http://img148.exs.cx/img148/606/p31700671mb.jpg http://img142.exs.cx/img142/3558/p31700663ab.jpg Amd one of the BOX http://img194.exs.cx/img194/8775/p31700693ip.jpg
Nice pics, but a little old. Saw them about 3 weeks ago and they were old then. But it still looks like a long way to go.
Seeing these really makes me wish we would just shut down the PMac (and related sports programs), convert it to another indoor football training facility and focus on what brings me joy.
Wow, the report about the upper deck being behind schedule was no joke. Based on about ten years of construction experience, I don't see anyway they make it by football season. Even though the actual structure of the deck will be some sort of precast concrete and will go into place fairly quick, I don't see them getting done before October. Good luck.
That's ok, I posted a link to those same pictures back then and was told they were old, so basically did the same thing as you did.
The old ramps are currently on their way down and I saw the supports being constructed, If it looks the same in a month, then we may be in trouble. I think they will reach a point were it will flow much more smooth soon.